- Version
- Download 142
- File Size 523.47 KB
- File Count 1
- Create Date 09/10/2026
- Last Updated 09/10/2026
ASX:D3E D3 Energy RaaS Flash Comment 2026 10 09
D3 Energy Limited (ASX:D3E) remains a compelling and highly leveraged investment play on natural gas and helium prospectivity in South Africa and Australia. The drilling campaign being conducted across ER315 represents a big and bold step out, being some 43km NW of the PR016 - Production Right Application (PRA) area. Importantly, initial world class helium concentrations of 5.2% support the geological model of ‘scale on a regional basis’, offsetting the unexpected water issues encountered in the wells. We note that further remedial works are in train with flow testing required before any resource certification. Whilst the presence of deeper water zones adds a layer of complication, it demonstrates that whilst the magneto-telluric (MT) surveys are demonstrating a strong correlation in identifying the presence of gas, geology doesn’t always co-operate. We would highlight though, that water is an engineering problem…flow rates will be the determinant of commerciality. In parallel, the company has also announced it has been awarded five new Technical Cooperation Permits (TCP) contiguous to existing tenements, encompassing some 47,000 acres and across the prospective structural trends already identified from existing discoveries. The critically important near-term re-rating point is testing to underpin reserves upgrades and better define the commercial case, in which we retain a high degree of confidence. Adding to the continuing progress, the company has been awarded Strategic Integrated Project Status covering ER315 and PR016. Given the critical nature of gas supply, it’s not surprising that the proposed production project has been granted this designation, intended to “…support projects of strategic importance to () economic development and energy security”. The squeeze on global helium and South African gas supply will not be resolved quickly and continues to support our view of D3E as an emerging new, independent producer in waiting. We expect the Middle East helium supply-constraint to persist perhaps through the next five years, so the commercial window is well and truly open. The company is progressing its PRA, seeking commercial resolution to support a FID decision, sometime in early 2027. We consider D3 Energy to be a niche opportunity in the global energy landscape, tapping into an overlooked helium and gas plays with project sanction within 12 months.

